About Products OEM / ODM Process Quality Guides Blog Careers Start a project

Quality governance

Define quality beforeproduction starts.

The quality plan turns subjective expectations into measurable checks for materials, dimensions, appearance, function, packaging and shipment, agreed up front.

Chloe Toys plush

Measurable, not subjective

Agree the checks before the first unit.

Critical-to-quality characteristics

The specific attributes that define a pass, set per product, not assumed.

Golden sample and tolerances

An approved reference sample and the tolerance rules measured against it.

Functional test method

How audio, sensors, buttons and firmware are verified on the line.

Defect classification and AQL

Minor, major and critical defects with an agreed inspection level.

Evidence it was followed

Proof, at every gate.

In-process checkpoints, pre-shipment inspection and a corrective-action route keep quality from drifting after the sample is approved. Ask for the records.

FCCCEEN71ASTM F963RoHSISO 9001
Material records
Golden sample photos
Inspection reports
Functional test results

Quick answers

Which safety standards can toys be made to?

Products can be built and tested to the requirements of your sales market, including EN71, ASTM F963, CE, FCC and RoHS, and the production site runs a quality management system certified to ISO 9001:2015. The age range, the labels, the tests needed and the inspection criteria are set in the quality plan before production, not after. State the sales country and the certification required in the quote request and we align the test plan with it.Request a quote

How does Chloe Toys control quality during production?

Quality is defined before the first unit: critical-to-quality characteristics per product, an approved golden sample with tolerance rules, a functional test method for audio, sensors, buttons and firmware, and defect classification with an agreed AQL inspection level. In-process checkpoints, pre-shipment inspection and a corrective-action route then keep production consistent with the approved sample. Send your project in the quote request and the quality plan is agreed as part of the route.Request a quote

What is a golden sample?

A golden sample is the approved reference unit that production is measured against, together with the tolerance rules for materials, dimensions, appearance, function and packaging. It is approved at the prototype stage and controls the move into pilot and mass production. Start with the quote request and the sample scope is stated in the first reply.Request a quote

Can I get inspection reports and test records?

Yes. Material records, golden sample photos, inspection reports and functional test results are kept at every stage of the process, and you can ask for them. Certificate numbers and full copies are shared under NDA during supplier qualification, and a buyer or third-party audit of the production site can be arranged. Ask for the records you need in the quote request.Request a quote

How do I get a quote from Chloe Toys?

Send your project through the quote request on chloetoys.com: product category, current stage, planning quantity, target market and the functions to review, plus a sketch, specification or reference if you have one. Our engineering team replies to your work email within one working day with a recommended OEM, ODM or hybrid route, a missing-information list, the sample scope and the next milestone. The first-pass plan is free, so start with the quote request.Request a quote

Send your project.Get a clear next step.

Not an instant price. A reviewed development route, the missing decisions and your next milestone.

Start a project → How it works